Projects

Stay informed with any and all projects the Hi-Line Future Foundation is working on. We would love to have your involvement in our projects as we thrive to create sustainable communities in Phillips County. 

Malta City Pool

Phase 1:

Repair/Replace coping, fill/fix cracks and upgrade pump- Spring 2025

phase 2 poster.png

Phase 2:

Intensive Remodel, scrapping pool back to shell and rebuilding it back to like new condition along with replacing the decking. Replacing/upgrading equipment in the mechanical room.

        -Est. Spring 2026; &/or once final goal                       of $600,000 is raised.

​

*Engineers mockup of the final project provided by ASL Drafting & Design

sustainability poster.png

Sustainability:

Hi-Line Future Foundation has a plan in place for the future of the Malta City Pool

old pool repair photos.png
old pool repair pictures.png

Prior Pool Rehab: 1993

Several feet were added to the pool so it would be regulation length for competitive swimming. New rebar was added to the pool and new cement/plaster was poured. The pool was resurfaced and the decking was repaired, much like the current pools plan for Phase 2- Intensive Remodel.

City of Malta Pool History: 1951-1956