Malta City Pool
Phase 1:
Repair/Replace coping, fill/fix cracks and upgrade pump- Spring 2025
Phase 2:
Intensive Remodel, scrapping pool back to shell and rebuilding it back to like new condition along with replacing the decking. Replacing/upgrading equipment in the mechanical room.
-Est. Spring 2026; &/or once final goal of $600,000 is raised.
​
*Engineers mockup of the final project provided by ASL Drafting & Design
Sustainability:
Hi-Line Future Foundation has a plan in place for the future of the Malta City Pool
Prior Pool Rehab: 1993
Several feet were added to the pool so it would be regulation length for competitive swimming. New rebar was added to the pool and new cement/plaster was poured. The pool was resurfaced and the decking was repaired, much like the current pools plan for Phase 2- Intensive Remodel.